Dig Footing Holes and Set Forms — Lay Out and Excavate Footings

Intermediate4 mins

Part of project

Decking and Railing Installation · Step 2 of 10

Helpful?

In this video

Using a Ryobi post-hole auger, dig multiple holes in the designated locations for the deck footings. The creator faces initial difficulties due to tree roots in the ground, requiring persistence. After successfully digging the holes, yellow Sonotube concrete forms are placed into each hole, ensuring they extend above ground level.

220.6K views5.5K

FAQs

Do I need a permit to build a new deck, and how do I ensure it meets local building codes?

Yes, a building permit is almost always required for deck construction. Before starting, consult your local building department for specific requirements, including frost depth for footings, span tables for joists and beams, and railing specifications. This ensures your deck is safe, structurally sound, and compliant with local regulations. Always get your plans approved before beginning work.

What's a realistic estimate for the time, difficulty, and cost of building a deck?

Building a deck is an intermediate to advanced DIY project that typically takes several weekends or even weeks for an individual, not just minutes, depending on its size and complexity. Costs vary widely based on material choices (e.g., pressure-treated lumber vs. composite), the deck's dimensions, and the need for specialized tools. Always budget for unexpected expenses and permit fees.

Beyond basic hand tools, what specialized equipment is essential for a successful deck build?

Key tools include a post hole digger for footings, a concrete mixer for preparing concrete, and accurate leveling tools like a transit level or a long level. A circular saw or miter saw for precise cuts, and an impact driver for efficient fastening of deck screws, will also be invaluable. These tools ensure efficiency, accuracy, and structural integrity.

What critical safety measures should I prioritize when constructing a deck?

Always wear appropriate personal protective equipment, including safety glasses, hearing protection, and work gloves, especially when using power tools. Be mindful of heavy lifting when working with lumber and concrete, and use proper lifting techniques to prevent injury. Before any digging, always call 811 to locate and mark underground utilities to avoid striking them.

Transcript
Hide

2002 uh I think I'm feeling good about it with fun about this uh that I just realized is because the elevation is so low to this curb here I don't even think we're have to put steps I think this will be enough of a step forward just my luck I'm hitting a tree stump I got a bunch of roots coming through here so I'm sure it's just a rout there now we're cooking oh we're cooking now if I can give you one piece of wisdom whether it's this spring this summer this fall and you're going to be do some yard work and you need to put some fence up post up maybe plant some trees get yourself an auger I swear even though I had some problems on the first hole cuz of the roots all three holes got done in what 8 minutes this is awesome this is awesome oh this is awesome got a dug down pass the frostline I'm going to cut these out make a final leveling cuz I got to make sure these are sitting just the right level for the anchors to go in and I think we'll be ready to start pouring our concrete this damn tree trunk this damn branch is sticking through right in the middle all right we're going to throw in some rocks for drainage reason why you don't want to have water pull up at the bottom of this thing and start lifting your footings out so this creates a little drainage around should be good